• EON 2nd

EON Model EL3

Description

Offering more security and versatility to meet illumination requirements, the UL 924 listed “EON” is fully-compliant with NFPA 101 7.9.3.1.3, and is the perfect complement for all life safety and emergency lighting applications. Available in 10 kW – 55 kW three phase sizes (seismic-rated up to 33 kW), the “EON” features one of the smallest three phase inverter cabinet footprints in the industry. This LED-compatible emergency lighting inverter is the ideal backup power solution to be specified for locations where a large number of people may be congregated and in which safe egress and life safety are imperative.

BrochureEON Model EL3

Visit Controlled Power’s Website


Example applications include:

  • Entertainment / Sports Venues
  • University, Healthcare, and Correctional Facilities
  • Worship Centers
  • Shopping Malls
  • Subway / Train Stations
  • Manufacturing Plants / Warehouses

Additional information

Base Runtime

90 mins

Battery Type

Valve-regulated, sealed lead calcium, maintenance-free. Front access terminals.

Brand Name

Controlled Power

Certifications/Safety

C-UL Listed to CSA C22.2 No. 141-15 – Emergency Lighting Equipment, EMI Compliance – FCC Class A limits, 47 C.F.R. Part 15, Subparts A, B, NFPA 101, 111, NEC and local codes, Quality – ISO 9001 :2015, UL 924 Listed – Auxilary Lighting and Power Equipment, UL 924 Listed – Emergency Lighting Equipment

Display

LCD display and LED indicators

Efficiency

90% Typical

Features

Alarm status display, Audible alarm with alarm silence, Auto-logging of test results and abnormal events, Date and time display, Logs up to 75 events, Multi-layer password protection, NFPA-compliant automatic battery testing/logging, Non-volatile clock and memory, Optional reporting of test results via email/voice/webpage, Optional status notification via email/cell phone, Programmable alarm set-points, Remote monitoring capabilities, System alarm annunciation, The Intellistat TS's monitor features include: LCD Display of all electrical paramiters, User-programmable automatic system testing

Hz

60

Topology

True online double-conversion, uninterruptible power

Transfer Time

Transfer On Delay (0 – 8 seconds) Transfer Off Delay (0 – 15 minutes)